PROJECT MAP

 

The map below depicts the location of the solar generation facility and the approximate transmission line route to the point of interconnection at the existing Bonnyman Substation. Final engineering design is ongoing, and this map does not represent the final construction design. Feedback on the design is encouraged and can be submitted through the Submit a Comment tab or by emailing info@brightmountainsolar.com. When submitting feedback, please include the location of your property and/or the location of concern.